Print
Sign up to receive a text message or email when new bids are added!

  

Print
Bid Title: Airport Public Notice to Engineering Consultants 5-Year Retainer
Category: Airport
Status: Closed

Description:

NOTICE TO AIRPORT CONSULTANTS 5-YEAR ENGINEERING RETAINER

Dubuque Regional Airport-(DBQ) is hereby soliciting Statement of Qualifications from consultants for airfield development projects that are anticipated to occur within the next five years.  Subject to receipt of Federal funding and/or State funding, these projects may include the following, which are not listed in any order of priority or importance:

1.    Acquire Snow Removal and Deicing Equipment (Plow, Blower and Deice Vehicles)

2.    Acquire Aircraft Rescue Fire Fighting Testing Equipment 

3.    Update 2022 Airfield PCI Study and Report PCR Data

4.    Construct Airport Photovoltaic (PV) Solar Array Systems

5.    Relocate Taxiway A (Phases 2, 3, 4 and 5)

6.    Construct Taxiway J located west of Runway 18/36 – Phase 1 Grade and Drain

7.    Construct Taxiway J located west of Runway 18/36 – Phase 2 Pave, Mark, and Light/Sign

8.    Extend Taxiway H from Taxiway G to Runway 31 End

9.    Reconstruct GA Apron

10.    Rehabilitate or Replace Air Traffic Control Tower

11.    Construct Aircraft Hangars

12.    Renovate General Aviation Terminal Building and Supporting Infrastructure

13.    Airfield Development, including Environmental/Plan/Study, archeological and other related studies

These projects have been developed from the Sponsor’s FAA Airport Capital Improvement Plan (ACIP) and IDOT Commercial Service Vertical Infrastructure Program (CSVI).  A copy of each project CIP Data Sheet may be made available upon request.  

Additional information is available on the attached document.


Publication Date/Time:
7/1/2022 12:00 AM
Closing Date/Time:
8/1/2022 5:00 PM
Pre-bid Meeting:
N/A
Related Documents:

Return To Main Bid Postings Page