NOTICE TO AIRPORT CONSULTANTS 5-YEAR ENGINEERING RETAINER
Dubuque Regional Airport-(DBQ) is hereby soliciting Statement of Qualifications from consultants for airfield development projects that are anticipated to occur within the next five years. Subject to receipt of Federal funding and/or State funding, these projects may include the following, which are not listed in any order of priority or importance:
1. Acquire Snow Removal and Deicing Equipment (Plow, Blower and Deice Vehicles)
2. Acquire Aircraft Rescue Fire Fighting Testing Equipment
3. Update 2022 Airfield PCI Study and Report PCR Data
4. Construct Airport Photovoltaic (PV) Solar Array Systems
5. Relocate Taxiway A (Phases 2, 3, 4 and 5)
6. Construct Taxiway J located west of Runway 18/36 – Phase 1 Grade and Drain
7. Construct Taxiway J located west of Runway 18/36 – Phase 2 Pave, Mark, and Light/Sign
8. Extend Taxiway H from Taxiway G to Runway 31 End
9. Reconstruct GA Apron
10. Rehabilitate or Replace Air Traffic Control Tower
11. Construct Aircraft Hangars
12. Renovate General Aviation Terminal Building and Supporting Infrastructure
13. Airfield Development, including Environmental/Plan/Study, archeological and other related studies
These projects have been developed from the Sponsor’s FAA Airport Capital Improvement Plan (ACIP) and IDOT Commercial Service Vertical Infrastructure Program (CSVI). A copy of each project CIP Data Sheet may be made available upon request.
Additional information is available on the attached document.