Sign up to receive a text message or email when new bids are added!
Bid Title: Rhomberg Avenue Bus Stop Improvements
Category: Engineering
Status: Open

Description:
CITY OF DUBUQUE
SHORT FORM
PUBLIC IMPROVEMENT PROJECT

RHOMBERG AVENUE BUS STOP IMPROVEMENTS


To furnish all material and equipment and to perform all labor necessary for (the Project)
:
Installation of new sidewalk and landing areas to provide safe and solid access to bus wheel chair
lift at six (6) locations. Including all excavation / concrete removal, installation of sidewalk and
landing areas, finish grading, topsoil, grass seed and installation of benches (provided.)
Installation of bus stop signs and shelter to be performed by City of Dubuque, Public Works
Department.

The work described above shall be completed at the following location(s)
:
Rhomberg Avenue and Hawthorne: install concrete pad and bench with solar powered
light (provided.) 4’ X 24’ of 5” sidewalk and 8’ X 10’ x 5” pad

Rhomberg Avenue and Shiras Avenue, southeast corner: 5’ X 20’ of 5” sidewalk, 8’ X 7’ pad with
bench (provided.)

Rhomberg Avenue and Shiras Avenue, northwest corner: Remove existing bench, install 4’ X 28’
of 5” sidewalk, 7’ X 8’ pad with bench and solar powered light (provided.) This location may
involve tree roots, all pruning of roots to comply with City of Dubuque forestry guidelines.

Rhomberg Avenue, and Marshall St. at Fire Station: install pad to accommodate 5.5’ X 7’ bus
shelter, small 20’ concrete retaining wall. 4’ X 24’ of 5” sidewalk and 10’ X 11’ X 5” thickness
pad, removal and relocation of book exchange site. Shelter will be installed by the City of Dubuque.

Rhomberg Avenue and Whittier Street, southeast corner: 4’ X 20’ of 5” sidewalk, 8’ X 5.5’ X 5”
thickness pad

Rhomberg Avenue and Whittier Street, northwest corner: 5’ X 30’ of 5” sidewalk, 7’ X 8’ X 5”
thickness pad. Both locations at this intersection may involve tree roots, all pruning of roots
to comply with City of Dubuque forestry guidelines.

Remove bench on Rhomberg Avenue north of Stanton Street.

The Contractor shall fully complete the Project under this Contract on or before May 12, 2017.

CONTRACT ESTIMATED AMOUNT $ 9,300.00

All bids are due at 2:00 p.m. March 31, 2017 at:
Office of the City Clerk
50 W 13th Street
Dubuque, IA 52001

Work to commence as weather permits, with completion on or before May 12, 2017


Publication Date/Time:
3/13/2017 12:00 AM
Closing Date/Time:
3/31/2017 2:00 PM
Contact Person:
Tom Kopp, Engineering Tech
City of Dubuque
563-589-4270
tkopp@cityofdubuque.org
Related Documents:
View Document(s)

Return To Main Bid Postings Page